Design data, coordination and remarks in one place.
Verkspor keeps issued and received documents, changes the permit authority approves, and remarks pinned to the drawing.
Main work
Issue documents, answer remarks and coordinate design.
Default start
Design data and pins on the drawing.
Practical examples
Record issued and approved documents
Each document gets a type, revision and status: draft, submitted or approved. A change during construction is marked separately, with a permit-authority reference.
Answer a remark on the drawing
The construction manager and trade master pin a remark to the sheet. The designer sees the place and description and can reply in the same entry.
Coordinate as design manager
The coordination register holds coordinated design data, designer scopes and handovers, plus correspondence with the owner.
Keep competence and declarations
Authorisation, continuing training and copies of declarations of responsibility stay with the person and the project — not in a folder nobody finds.
“The documents, the changes and the remarks belong in the same place as the drawing.”
